HomeServicesProjectsBid InfoFAQ'sAbout the owner

PROJECT EXPERIENCE
As Union Sheet Metal Worker and Union CADD Opperator

Project Experience:

Doctors Medical Center, Modesto, CA: Extensively involved in the new construction and/or remodeling of the

Emergency Room, Operating Rooms, Imaging Room, Mechanical Building and the Women's and Children's Labor and Delivery Facility.

Memorial Medical Center, Modesto, CA: Involved in the new construction and/or remodeling of the Phase 1 & 2 projects, Life Safety Fire/Smoke protection update, Pharmacy and the Dining Facility.

Modesto Imaging Center, Modesto, CA: Involved in the new construction of the MRI facility.

General Mills, Inc., Lodi, CA: Three years cereal plant experience on various new and remodel projects— Industrial sheet metal.

Kraft General Foods, Inc., Modesto, CA: Two years cereal plant—Industrial sheet metal.

Basic Foods, Modesto, CA: Two years Vegetable processing Plant—Industrial sheet metal.

Champion Industrial Contractors, Modesto, CA:Fabricated and installed 16 oz. TDF standing seam copper roof on new 2-story office building.

Grothe & Smith Architects, Modesto, CA: Designed, fabricated and installed 16 oz. standing seam copper roof on single story office building.

Merced County Public Health Center, Merced, CA: HVAC CADD on a two story medical

Facility (fully coordinated shop drawings).

10th Street Place, Modesto, CA:HVAC CADD on a 265,000 sq. ft. Design/Build 7-Story Office Tower and 4-Story Parking Garage (fully coordinated shop drawings).

New United Motor Manufacturing Inc. (Toyota), Fremont, CA:Industrial CADD for  large automobile painting facility.

Lawrence Livermore National Laboratory, Livermore, CA:HVAC/Industrial sheet metal CADD on numerous high security new construction and remodel projects.

Mercy Hospital, Merced, CA: HVAC CADD manager/operator on Prenatal Expansion Project (fully coordinated shop drawings).

California State University at Stanislaus, Turlock, CA: Educational Services Building, HVAC CADD manager/operator on 4-Story New Construction Building (fully coordinated drawings).

Madera Juvenile Detention Facility, Madera, CA: HVAC CADD manager/operator on single story

Detention facility (fully coordinated drawings).

Wells Middle School/Valley High School, Dublin, CA:Architectural sheet metal CADD.

Table Mountain Casino, Friant, CA:HVAC CADD manager/operator on design/build for large Indian Casino (fully coordinated drawings).

Sonora Community Hospital, Sonora, CA:HVAC CADD manager/operator on 4 story new hospital and 2 story Medical office bldg. (fully coordinated shop drawings).

Del Rio Golf and Country Club, Modesto, CA:  Architectural sheet metal CADD for large 16 oz standing seam copper roof.      

Kaiser Permanente, Modesto, CA:HVAC CADD manager/operator on (2) new Medical Office Buildings.

University of California at Merced, Merced, CA: HVAC CADD manager/operator on 4 story new Campus Library.

North west Career and Technical Center, Las Vegas, NV:Managed CADD operations

University Medical Center, Las Vegas, NV:Managed HVAC CADD operations

Forbus Elementary School, Las Vegas, NV:Managed HVAC CADD operations

Smalley Elementary School, Las Vegas, NV:Managed HVAC CADD operations

Faiss Middle School, Las Vegas, NV:Managed HVAC CADD operations

UNLV Student Recreation Center, Las Vegas, NV:HVAC CADD Manager/operator/MEP CAD Manager

McCarran Intl. Airport, Las Vegas, NV: HVAC CADD Manager/operator on ‘C’ Gate Security Annex addition

McCarran Intl. Airport, Las Vegas, NV: HVAC CADD Manager/operator on ‘D’ Gate Terminal addition

Jones Fiber Products, Las Vegas, NV:Project Manager and CADD operations for new industrial facility

UNLV Dental Facility, Las Vegas, NV:Managed HVAC CADD operations

Turnberry Tower 4, Tower East and Tower West, Las Vegas, NV:Managed HVAC CADD operations on (3) 45 story iniums.

McCarran Intl. Airport, Las Vegas, NV:HVAC CADD Manager/operator on ‘T-3’ Gate addition.

California State University at Chico, Chico, California:HVAC CAD Services on 2 story Wildcat Activity Center.
Campos Office Building, Las Vegas, Nevada:HVAC CAD on 5 story professional office building.
Turnberry Executive Offices, Las Veags, Nevada: HAVC CAD on 2 story professional office building.
City Center Fire Department, las Vegas, Nevada: HVAC CAD on fire station.

Franciscan University Holy Spirit Friary, Steubinville, IL: HVAC CAD on New 2 story campus building.

McCarran Intl. Airport, Las Vegas, NV:HVAC CADD Manager/operator on ‘T-3’ Gate addition.

California State University at Chico, Chico, California:HVAC CAD Services on 2 story Wildcat Activity Center.
Campos Office Building, Las Vegas, Nevada:HVAC CAD on 5 story professional office building.
Turnberry Executive Offices, Las Veags, Nevada: HAVC CAD on 2 story professional office building.
City Center Fire Department, las Vegas, Nevada: HVAC CAD on fire station.

Franciscan University Holy Spirit Friary, Steubinville, OH: HVAC CAD on New 2 story campus building.

Lombard Aquatic Center, Lombard, IL: HVAC CAD on large Indoor Aquatic Center.

Just to name a few...

Enter content here